HOW CAN THE LOOTS SMC CARRY CASE BENEFIT YOUR WORK PRODUCTION ON SITE?
- LSMC Loots
- Oct 29, 2023
- 1 min read

This is a great example of the material shifting process with workers on each platform to shift material from the bottom to the top to finish the structural build shifting components one by one.
OUR MISSION is to speed up the process and use less manual labour to complete any structural build that will save you time and money.
FOR EXAMPLE: You are using our 3 or 5 compartment carry case with a pulley / hoist system which will speed up the shifting process and use less manpower in a working shift.
You will simply need 2 men at the bottom of the installation process and 2 at the top for the offload process to then hand over to the building crew to speed up the workflow.
This will also assist you to shift 3-5 scaffold components rather than one by one that prolongs production time.
This will give the rest of the crew the opportunity to focus on the actual build / erection of the structure to complete before the estimated time frame given.

Comments